GE Power bags order worth Rs 440 crore from GSECL 
Corporate Watch

GE Power bags order worth Rs 440 crore from GSECL

GE Power India has bagged an order worth Rs 440 crore from Gujarat State Electricity Corporation Limited (GSECL)

PTI

New Delhi: GE Power India has bagged an order worth Rs 440 crore from Gujarat State Electricity Corporation Limited (GSECL).

GE Power India Limited has received a Letter of Intent from Gujarat State Electricity Corporation Ltd, the company said in a regulatory filing.

The basic value of the contract is Rs 440 crore plus GST (18 percent).

The order includes design, engineering, manufacture, supply, Packing & forwarding, installation, commissioning & PG Testing of FGD (flue gas desulfurization) System, it added.

The order will be executed within 30 months from the date of letter of intent, i.e. by January 2026.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Two LNG cargoes en route India as govt moves to bridge 47.4 MMSCMD gas supply disruption

SAIL clocks record sales of 18.24 MT in Apr–Feb FY26; cash collection crosses Rs 1.11 lakh crore

India's Russian oil buy surges 50% amid scramble to replace lost barrels

Monitor LPG supply, prevent hoarding, black marketing of cylinders: Centre to states

DPIIT inks pact with Voltas to support startups