GE Power bags order worth Rs 440 crore from GSECL 
Corporate Watch

GE Power bags order worth Rs 440 crore from GSECL

GE Power India has bagged an order worth Rs 440 crore from Gujarat State Electricity Corporation Limited (GSECL)

PTI

New Delhi: GE Power India has bagged an order worth Rs 440 crore from Gujarat State Electricity Corporation Limited (GSECL).

GE Power India Limited has received a Letter of Intent from Gujarat State Electricity Corporation Ltd, the company said in a regulatory filing.

The basic value of the contract is Rs 440 crore plus GST (18 percent).

The order includes design, engineering, manufacture, supply, Packing & forwarding, installation, commissioning & PG Testing of FGD (flue gas desulfurization) System, it added.

The order will be executed within 30 months from the date of letter of intent, i.e. by January 2026.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

DoT comes out with draft rules for provision of main telecom services under new authorisation framework

Civil Aviation Minister holds review meeting with airline representatives

Domestic coal production drops marginally in Apr-Aug period to 381.75 MT

Full benefits of GST rate cuts must be passed on to consumers, says Piyush Goyal

CIL mulls setting up data centres in decommissioned mines to boost digital infra, sustainability