Tata Power Renewable secures 400 MW hybrid project from MSEDCL Representative Image
Corporate Watch

Tata Power Renewable secures 400 MW hybrid project from MSEDCL

Tata Power Renewable has secured a LoA from the MSEDCL for the development of a 400 MW Wind-Solar Hybrid project in Maharashtra

PSU Watch Bureau

New Delhi: Tata Power Renewable Energy Limited (TPREL) has successfully secured a letter of award (LoA) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL) for the development of a 400 MW Wind-Solar Hybrid project in Maharashtra.

PSU Watch is now on Whatsapp Channels. Click here to join

The LoA includes an original contracted capacity of 200 MW and a greenshoe option for an additional contracted capacity of 200 MW, making this the largest renewable energy project for TPREL in the state of Maharashtra to date.

The project is part of MSEDCL's broader initiative to meet the state's Renewable Purchase Obligation (RPO) and address future power demands at competitive tariff. The LoA was issued through a competitive bidding process conducted via an electronically-based reverse auction portal.

The project is expected to be completed within 24 months from signing of the Power Purchase Agreement (PPA) between TPREL & MSEDCL and will play a crucial role in cutting carbon emissions, with an estimated reduction of 895 million kilograms of CO2 annually.

The electricity generated by the hybrid project, which combines solar and wind energy, will be supplied to MSEDCL, aiding the utility company in meeting its energy needs sustainably and enhancing Maharashtra’s renewable energy portfolio. The installation will make efficient use of local land resources in the state, further boosting regional development. TPREL’s collaboration with the Government of Maharashtra and Discoms reinforces its role in advancing the state’s renewable targets and transitioning to a low-carbon future, underscoring TPREL’s commitment to green energy innovation and meeting the evolving power demands responsibly.

With this achievement, TPREL's total renewable energy capacity now stands at 10.5 GW with 5.7 GW of projects in various stages of implementation. Its operational capacity has reached 4.8 GW, comprising 3.8 GW of solar and 1 GW of wind energy projects.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

IIFCL in talks with ADB, Korean Exim Bank to raise $600 million

Govt notifies telecom cyber security rules; sets timelines for telcos to report security incidents

Govt invites job applications for PNGRB's Member post

Power Minister visits NHPC’s Nimoo Bazgo Power Station in Ladakh

Delegates from 18 countries attend RBI's policy conference of Global South central banks