Latest News

Kudankulam Nuclear Power Plant’s four units to be completed by 2027: Dr Jitendra Singh

Dr Jitendra Singh informed the House that at present, Kudankulam Nuclear Power Plant Units 1 & 2 of 1000 MW capacity each are already in operation and the remaining four units of 1000 MW each are under construction

PSU Watch Bureau

New Delhi: Union Minister of State Atomic Energy and Space Dr Jitendra Singh said, at present, Kudankulam Nuclear Power Plant Units 1 & 2 of 1000 MW capacity each are already in operation and the remaining four units of 1000 MW each are under construction. On their progressive completion, the full capacity of Kudankulam site of 6000 MW is expected to be reached by the year 2027.

In a statement laid on the table of the Rajya Sabha in reply to a question, Dr Singh said, the projected installed capacity of Kudankulam site is 6,000 MW, comprising of six nuclear power reactors of 1000 MW capacity each. The first two units i.e. KKNPP -1 & 2 (2X1000 MW) are in operation and the remaining four units i.e. KKNPP – 3 & 4 (2X1000 MW) and KKNPP – 5 & 6 (2X1000 MW) are under construction.

The power generated by nuclear power plants (including Kudankulam nuclear power plants) is allocated by the Ministry of Power (MoP) to the various beneficiary states / union territories in the region from time to time. The state of Kerala has a firm allocation of 266 MW from KKNPP – 1 & 2 apart from the unallocated quota. Presently the state of Kerala has a share (firm plus unallocated) of 13.48 percent from KKNPP-1 (1000 MW) and 13.30 percent from KKNPP-2 (1000 MW).

With regard to the allocation of power from units under construction, i.e. KKNPP-3 & 4 (2X1000 MW) & KKNPP – 5 & 6 (2X1000 MW),

MoP will take a decision and communicate at an appropriate time.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

IIFCL in talks with ADB, Korean Exim Bank to raise $600 million

Govt notifies telecom cyber security rules; sets timelines for telcos to report security incidents

Govt invites job applications for PNGRB's Member post

Power Minister visits NHPC’s Nimoo Bazgo Power Station in Ladakh

Delegates from 18 countries attend RBI's policy conference of Global South central banks