Nokhra solar project to begin commercial operation from Dec 30: NTPC 
Latest News

Nokhra solar project to begin commercial operation from Dec 30: NTPC

50 MW solar power capacity of Nokhra project in Bikaner will begin commercial operation from December 30, said NTPC in a regulatory filing

PSU Watch Bureau

New Delhi: NTPC on Thursday said that 50 MW solar power capacity of Nokhra project in Bikaner will begin commercial operation from December 30. Earlier this month, a 100 MW unit of the project started commercial operation, as per a BSE filing.

"Consequent upon successful commissioning, second part capacity of 50 MW out of 300 MW Nokhra solar PV project at Bikaner, Rajasthan, is declared on commercial operation with effect from 00:00 Hours of December 30, 2022," the filing said.

With this, standalone installed and commercial capacity of NTPC will become 58,259 MW, while the group's capacity will be 70,874 MW, it stated.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

India’s crude import bill for April-October nears full-year 2025-26 total

DTC plans to tie up with Indian Oil to set up petrol pumps at its bus depots

SEBI proposes tighter tenure limits for MDs, lower age cap for public interest directors at MIIs

NITI Aayog bats for land acquisition in advance for future projects in Maharashtra

CAG launches multi-year audit of 101 cities to assess urban reforms