Latest News

NTPC commences coal production from Chatti-Bariatu mine

PSU Watch Bureau

Ranchi: State-run power giant NTPC on Friday said it has commenced coal production from its Chatti-Bariatu mine in Jharkhand's Hazaribag district. With this Chatti-Bariatu became the fourth coal producing mine of the company and the coal from the mine will used in the power stations of NTPC.

"Mining operations started in Chatti-Bariatu on April 25 and within a span of one month NTPC touched the coal seam. The peak-rated capacity of this mine will be 7 million tonnes per annum (MTPA) to be achieved in four years time," the company said in a statement.

Hazaribag Deputy Commissioner Nancy Sahay inaugurated the coal production on September 29 in presence of Superintendent of Police Manoj Ratan Chothe, Regional Executive Director (Coal Mining), NTPC Partha Mazumdar and others.

As part of NTPC's commitment toward environmental protection, trees were planted by DC Hazaribag, SP Hazaribag and others in NTPC Chatti-Bariatu Mine Site Office.

NTPC captive coal production

NTPC is India's largest energy conglomerate with with a capacity of approximately 68 GW. From fossil fuels, it has forayed into generating electricity via hydro, nuclear and renewable energy sources.

NTPC has started coal production from its three coal blocks – Pakri Barwadih in Jharkhand, Dulanga in Odisha and Talaipalli in Chhattisgarh.

NTPC has declared commercial operation of its two mines – Pakri Barwadih and Dulanga Coal Block. During FY 2021-22, NTPC achieved 14.02 MT coal production from its three operating mines.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

DVC collaborates with NPTI for learning and development

GSL lays keel of 1st Next Generation Offshore Patrol Vessel

Troop Comforts looking to hire Director (Operations); apply before May 28

Air India reduces cabin baggage allowance to 15 kg for lowest fare segment

IREDA aims to play a pivotal role in achieving 500 GW RE capacity: CMD