ReNew Power installs wind turbine generators at RTC project in Karnataka 
Latest News

ReNew Power installs wind turbine generators at RTC project in Karnataka

ReNew Power on Tuesday said that it has installed wind turbine generators at round-the-clock (RTC) renewable energy project in Gadag, Karnataka

PSU Watch Bureau

New Delhi: ReNew Power on Tuesday said it has installed wind turbine generators at round-the-clock (RTC) renewable energy project in Gadag, Karnataka. The wind turbine generators (WTGs) have a capacity of 3.3-3.465 MW and are 140 metres in height, said the company in a statement.

Sumant Sinha, Chairman and CEO, ReNew Power, said, "We want a carbon emission-free India whose growth story is powered by clean energy. This installation brings us one step closer to our goal of boosting India's economic growth by accelerating the clean energy transition." The company did not share any further details.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Kolkata Metro to increase Purple Line services, operating from 6.40 am to 9.26 pm

Bank unions pitch for regular jobs rather than contractual ones

UP Govt to provide 40,521 subsidised solar pumps to farmers in FY26

FinMin, RBI working on portal to help citizens claim unclaimed assets: DFS Secy

SC to consider plea for listing petitions of states in minerals royalty case