National News

NTPC announces commercial operation of 8 MW capacity at Auraiya solar PV project

NTPC Limited has announced the commercial operations of 8 MW capacity at its 20 MW Auraiya Solar PV Project

PSU Watch Bureau

New Delhi: India's largest power generator NTPC Limited has announced the commercial operations of 8 MW capacity at its 20 MW Auraiya Solar PV Project. With this, NTPC has added 8 MW solar power to its renewable power generation portfolio. The remaining 12 MW solar capacity of the Auraiya Solar PV Project is under implementation and is expected to be operational by March 2021.

"Consequent upon successful commissioning, 8 MW part capacity of 20 MW Auraiya Solar PV Project at Auraiya, UP, has been declared on Commercial Operation w.e.f. 00:00 Hrs. of 10.11.2020," the Maharatna PSU said in a regulatory filing to the stock exchanges on Tuesday.

With this, NTPC and NTPC Group's total installed and commercial capacity now stands at 51,163 MW and 62,918 MW, respectively. The present installed capacity of NTPC group comprises 46 NTPC stations i.e. 24 coal-based, 7 combined cycle gas & liquid fuel, 1 hydro, 14 renewables and 25 JV and subsidiaries stations i.e. 9 Coal, 4 gas & liquid fuel, 8 hydro, 4 renewables. By 2025, the company planning to achieve the target of 1 lakh MW of capacity. 

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Telegram. Join PSU Watch Channel in your Telegram and stay updated)

West Asia conflict: India has enough fertiliser stocks, no need to panic, says Nadda

19 India-bound energy vessels stranded in Strait of Hormuz: Shipping Secretary

Govt operationalises record 30 mineral blocks in FY26

Centre's fiscal deficit touches 80.4 pc of full-year target at Feb-end: CGA

India to offer 21 oil, gas blocks in OALP XI bidding round