National News

Bullet Train Project: NHSRCL signs agreement with L&T for design and construction work

National High Speed Rail Corporation Limited (NHSRCL) has signed an agreement with Larsen & Toubro (L&T) for design and construction of about 8 Km of viaduct including an HSR station in Vadodara

PSU Watch Bureau

New Delhi: National High Speed Rail Corporation Limited (NHSRCL) has signed an agreement on Thursday with Larsen & Toubro (L&T) Limited for the design and construction of about 8 Km of viaduct including a HSR station in Vadodara in the state of Gujarat for Mumbai-Ahmedabad High Speed Rail Corridor (MAHSR C-5 Package).

NHSRCL, which is responsible for bullet train projects in India, had opened financial bids for the design and construction of the above-said project in December 2021 in which L&T emerged as the lowest bidder.

To ensure seamless integration with the railways, the Vadodara HSR station is planned above the existing platform No 7 of Vadodara station of the Indian Railway. With this integration, the passengers will get the comfort of easy transfer between HSR and Indian Railways.

NHSRCL has already awarded 100 percent civil contracts for the construction of MAHSR alignment in Gujarat state (352 km out of 508 km of total MAHSR corridor) including eight (08) HSR stations (at Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Billimora and Vapi) and two Rolling stock depots at Sabarmati and Surat.

NHRCL's Director (Project) Rajendra Prasad and other Directors from NHSRCL and officials from Larsen and Toubro Limited attended the contract signing ceremony.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Thursday: Stock markets decline for fourth day in a row in early trade

Coal ministry releases AAROH mine-closure report, signs EUR 10-million mine closure cooperation pact with GIZ

NTPC Green consolidated Q1 net profit rises 38% to Rs 305 crore; standalone profit dips

Senior IAS officer Anurag Jain appointed NITI Aayog CEO

Dr Komal Kapoor takes charge as CMD of ECIL