Adani Green Energy begins operation of 775 MW solar projects in Gujarat Representative Image
News Updates

Adani Green Energy begins operation of 775 MW solar projects in Gujarat

Adani Green Energy on Friday announced the beginning of the operation of its 775 megawatt solar power projects in Khavda, Gujarat

PSU Watch Bureau

New Delhi: Adani Green Energy on Friday announced the beginning of the operation of its 775 megawatt solar power projects in Khavda, Gujarat.

The capacities have been operationalised after securing relevant clearances, Adani Green Energy Ltd (AGEL) said in an exchange filing.

PSU Watch is now on Whatsapp Channels. Click here to join

Adani Green Energy through its various wholly-owned stepdown subsidiaries has operationalised an aggregate 775 MW solar power projects at Khavda, Gujarat, it said.

"Based on the relevant clearances, it was decided at 00:12 am on March 29, 2024 to operationalize the plant and commence power generation from March 29, 2024," the company said.

Part of the Adani Group, AGEL has the largest operating renewable portfolio in India, spread across 12 states.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

CAG exposes critical flaws in MeitY skill schemes: Multiple enrolments, low placements, data gaps

West Asia crisis: As OMCs bleed cash, windfall tax on ATF, diesel exports do not apply to Reliance's SEZ refinery

NALCO posts record production, sales surpassing 40-year history

CAG raps India Post Payments Bank: Unverified accounts, 362-Hour UPI outages exposed

Captive, commercial coal output rises 10.22% to 210.46 MT in FY26; despatch up 7.35%