Adani Green Energy begins operation of 775 MW solar projects in Gujarat Representative Image
News Updates

Adani Green Energy begins operation of 775 MW solar projects in Gujarat

Adani Green Energy on Friday announced the beginning of the operation of its 775 megawatt solar power projects in Khavda, Gujarat

PSU Watch Bureau

New Delhi: Adani Green Energy on Friday announced the beginning of the operation of its 775 megawatt solar power projects in Khavda, Gujarat.

The capacities have been operationalised after securing relevant clearances, Adani Green Energy Ltd (AGEL) said in an exchange filing.

PSU Watch is now on Whatsapp Channels. Click here to join

Adani Green Energy through its various wholly-owned stepdown subsidiaries has operationalised an aggregate 775 MW solar power projects at Khavda, Gujarat, it said.

"Based on the relevant clearances, it was decided at 00:12 am on March 29, 2024 to operationalize the plant and commence power generation from March 29, 2024," the company said.

Part of the Adani Group, AGEL has the largest operating renewable portfolio in India, spread across 12 states.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Domestic coal production drops marginally in Apr-Aug period to 381.75 MT

Full benefits of GST rate cuts must be passed on to consumers, says Piyush Goyal

CIL mulls setting up data centres in decommissioned mines to boost digital infra, sustainability

OMC launches ‘LeaDHer 2025’ to strengthen women leadership under DEI framework

BEML wins Gold at EEPC India Quality Awards 2025