New Delhi: State-owned Bharat Heavy Electricals Limited (BHEL) on Monday said it has secured an order worth Rs 13,500 crore from NTPC for main plant package of 2,400 MW Telangana Stage-II thermal power plant.
BHEL emerged as a successful bidder for this project in October 2024, a regulatory filing said.
Follow The PSUWatch Channel on WhatsApp
On March 29, 2026, BHEL received a Notification of Award (NOA) from NTPC for 3x800 MW Telangana Stage-II project (Main Plant Package).
The scope of order includes design, engineering, manufacturing, supply, erection, commissioning, and testing of the main plant package, including civil and structural works.
The order size is Rs 13,500 crore excluding GST.
(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)