Budni-Barkhera third line 
News Updates

Bhopal & Itarsi to get elevated rail connectivity: Ministry of Railways

PSU Watch Bureau

New Delhi: In a tweet, the Ministry of Railways announced on Wednesday that Bhopal, the capital city of Madhya Pradesh, and Itarsi, a bustling commercial hub for agricultural goods, are set to benefit from an upcoming elevated rail connectivity project. The initiative aims to establish a third railway line between Budni and Barkhera, spanning a distance of 26.5 kilometres, with significant progress already achieved.

Budni-Barkhera third line project has reached completion rate of 87%

With an estimated cost of Rs 1,638.94 crore, the Budni-Barkhera third line project has reached an impressive completion rate of 87 percent. Once operational, this elevated rail connection will bring numerous advantages, including enhanced line capacity and reduced travel time between Bhopal and Itarsi. Also, the new railway line will contribute to decongesting existing routes and accommodating the rising passenger and freight traffic between Bhopal and Itarsi.

Elevated rail infrastructure will facilitate faster & more efficient transit

The introduction of an additional railway line is expected to address the growing transportation demands of the region, especially regarding the movement of agricultural goods and other commercial commodities. The elevated rail infrastructure will facilitate faster and more efficient transit, benefiting both commuters and businesses relying on the Bhopal-Itarsi route.

Bhopal-Itarsi route

Bhopal-Itarsi route of West-Central Railway is responsible for carrying enormous passengers and goods traffic. Currently, more than 110 mail/express trains are operating on this route along with average of 48 goods trains. The sectional capacity utilisation is 170 percent. Sectional capacity utilisation in Indian railways refers to the efficient use of infrastructure and resources within specific sections, ensuring optimal allocation of capacity to meet demand and maximise operational efficiency.

With the construction of third line, traffic congestion will be eased. Besides, goods train movement will also become smooth after this major development.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

RE-Invest 2024: SECI plans foray into RE power generation, to add 10 GW by 2030

At COP29, India to focus on quantifying financial requirements for Global South, Minister at RE-Invest

RE-Invest 2024 has potential to be powerful catalyst for climate action, says V-P

RBI unlikely to cut interest rate in 2024: SBI Chief

IREDA gets Govt nod to raise upto Rs 4500 crore through QIP