CAG 
News Updates

CAG raises safety concerns over 3.3 lakh wagons being operated without NCO approval

More than 3.3 lakh repaired wagons were operated without NCO approval and this has compromised safety, said a report by CAG

PSU Watch Bureau

New Delhi: More than 3.3 lakh repaired wagons were operated without NCO approval and this has compromised safety, according to a new report by the Comptroller and Auditor General of India. Neutral Control Office in workshops/yards are meant for an independent examination of repaired wagons or those that go undergo periodic overhauls before their actual handing over to open line for operations.

NCO approval is vital for wagons

An NCO approval is vital as wagons repaired in workshops are subject to a check by the Neutral Train Examiner (NTXR). Only those certified fit can be inducted into service. Those found defective by NTXR are detained for further attention.

More than 3.3 lakh wagons were passed locally: CAG

"More than 3.3 lakh wagons constituting 41 percent of the total were passed locally (without NCO approval) after being repaired at workshops/terminal yards, compromising safety," the CAG report said.
It also said that an analysis of the FOIS (Freight Operations Information System) data for 2016-17 to 2020-21 revealed that the halt time was close to half of the total travel time and hence the average speed was also close to half of the average speed without halt time.

Zonal railways didn't participate in assessment of wagon requirements

The report also said that in violation of the codal provisions, Zonal Railways did not participate in the assessment of wagon requirements or send proposals or justification for their acquisition to the Railway Board. "In absence of any input from the zones, RB kept on changing the requirements of wagons. Available wagon holding was more than the wagon requirement, as assessed in the audit on the basis of wagon utilisation norm (NTKM), throughout the review period.

"Supply of wagons by wagon manufacturers was not commensurate with the allotment of wagons made by the Railway Board and there were huge delays in supply. Rakes were cancelled by parties due to non-supply by the Railway administration resulting in loss of potential earnings," it said.

Detention of rakes

The report also highlighted that there were instances of detention of rakes in the selected loading and unloading points/terminal yards which resulted in a loss of wagon days and their earning capacity. "In around 69 percent of wagons abnormal delay was noted in connecting the unconnected wagons resulting in loss of earning capacity of wagons for the time taken for connecting those wagons. Moreover, the assistance of FOIS was not taken in all zones for connecting those unconnected wagons," it said.

CAG raises concerns over 6 tenders finalised by RB

The CAG also raised concerns over six tenders finalised by the Railway Board during the period from 2016-17 to 2020-21, in which the cost of wheels and axles consumed and destroyed in testing was included in the total supplies made to the Railways instead of supplying free of charge by the manufactures.

"This was in contravention to the provisions of the standard specifications of RDSO and led to a loss to the tune of Rs 5.88 crore. In another case, placing orders for a specification of the axle other than the requirement of the end user resulted in procurement of additional 3,400 units of axles resulting into the avoidable expenditure of Rs 18.01 crore," it said.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Sensex, Nifty bounce back in early trade after sharp fall in previous session

These are the Central, state PSUs named in US court indictment in Adani bribery case

Gautam Adani bribery case: Allegations, rebuttals, stock market wipeout & all you want to know

Cannot accept attempts to shift focus away from finance at COP29: India

NLC India, ACC others bag five coal mines in 10th round of auction