Energy storage systems important to increase share of RE in power generation: ICRA PSU Watch Archives
News Updates

Energy storage systems important to increase share of RE in power generation: ICRA

According to ICRA, energy storage systems are critical to increase the share of power generated through renewable energy sources

PTI

New Delhi: Energy storage systems are critical to increase the share of power generated through renewable energy sources, according to ICRA.

The share of renewable energy power generation, including large hydro, to India's total power production will increase to close to 40 percent by FY'2030 from less than 25 percent currently, the rating agency said in a report.

PSU Watch is now on Whatsapp Channels. Click here to join

The increase will be driven by the large RE capacity addition process, it said.

"Achieving such a high level of RE share would require development of energy storage systems (ESS) to manage the intermittency associated with wind and solar power. The ESS is currently mainly driven by the battery energy storage systems (BESS) and pumped hydro storage projects (PSP)," ICRA said.

The BESS also plays a role in improving grid stability, providing ancillary support services and peak load shifting, it said.

Girishkumar Kadam, Senior Vice President & Group Head - Corporate Ratings, ICRA, said: "The discovered tariff under the BESS tenders more than halved from Rs 10.84 lakh/MW/month in the first Solar Energy Corporation of India (SECI) tender in August 2022 to Rs 4.49 lakh/MW/month in the latest tender by Gujarat in March 2024, reflecting the decline in battery prices and improving competitiveness of such projects. The viability of these projects remains pegged to the capital cost of the BESS."

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Air India pays compensation to 2/3rds of June 12 crash victims

Tata Steel receives Rs 1,902 crore demand notice over 'shortfall' in mineral dispatch from Odisha block

BEML secures $6.23 million export orders for mining equipment from the CIS Region

NBCC to lead Rs 44 crore campus expansion at Energy Institute Bengaluru, bolstering South India’s energy education hub

A new heartbeat for India’s mining heartland: Inside SECL’s record CSR year