JSW Energy gets contract from SECI for supply of 230 MW renewable energy 
News Updates

JSW Energy gets contract from SECI for supply of 230 MW renewable energy

JSW Energy on Thursday said its arm received a letter of award from SECI for supply of 230 MW of power from its renewable energy project

PTI

New Delhi: JSW Energy on Thursday said its arm received a letter of award from Solar Energy Corporation of India (SECI) for supply of 230 MW of power from its renewable energy project.

The energy supply order has been secured by wholly-owned subsidiary JSW Neo Energy Limited, JSW Energy said, adding that the company received the letter of award following a tariff-based competitive bidding process.

PSU Watch is now on Whatsapp Channels. Click here to join

Bids were invited for supply of 630 MW of firm and dispatchable power from an inter state transmission system or ISTS-connected renewable energy project SECI-FDRE-IV, JSW Energy said in an exchange filing.

With the latest contract, the company's total locked-in generation capacity has increased to 16.4 GW, which includes a hybrid capacity of 2.3 GW, including FDRE (firm and dispatchable renewable energy).

The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

ED registers fresh case against Anil Ambani, RCom linked to SBI 'fraud'

National Test House to focus on AI-driven testing facilities: Pralhad Joshi

India in active dialogue with US for free trade pact: Goyal

India not pursuing alternative to US dollar for global trade: CEA

Govt committed to positioning India as shipbuilding hub: Sahntanu Thakur