JSW Energy gets contract from SECI for supply of 230 MW renewable energy 
News Updates

JSW Energy gets contract from SECI for supply of 230 MW renewable energy

JSW Energy on Thursday said its arm received a letter of award from SECI for supply of 230 MW of power from its renewable energy project

PTI

New Delhi: JSW Energy on Thursday said its arm received a letter of award from Solar Energy Corporation of India (SECI) for supply of 230 MW of power from its renewable energy project.

The energy supply order has been secured by wholly-owned subsidiary JSW Neo Energy Limited, JSW Energy said, adding that the company received the letter of award following a tariff-based competitive bidding process.

PSU Watch is now on Whatsapp Channels. Click here to join

Bids were invited for supply of 630 MW of firm and dispatchable power from an inter state transmission system or ISTS-connected renewable energy project SECI-FDRE-IV, JSW Energy said in an exchange filing.

With the latest contract, the company's total locked-in generation capacity has increased to 16.4 GW, which includes a hybrid capacity of 2.3 GW, including FDRE (firm and dispatchable renewable energy).

The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

From hockey gold to badminton bronze, ONGC-backed athletes make their mark at Asian Games 2026

Power Grid establishes Centre of Excellence at Punjab Engineering College

Rupee falls 4 paise to 96.39 against US dollar in early trade

Sensex, Nifty rise in early trade on buying in bank stocks, Reliance Industries

India-US trade talks reach ‘Plateau’, limited room for further concessions: Sitharaman