JSW Energy gets contract from SECI for supply of 230 MW renewable energy 
News Updates

JSW Energy gets contract from SECI for supply of 230 MW renewable energy

JSW Energy on Thursday said its arm received a letter of award from SECI for supply of 230 MW of power from its renewable energy project

PTI

New Delhi: JSW Energy on Thursday said its arm received a letter of award from Solar Energy Corporation of India (SECI) for supply of 230 MW of power from its renewable energy project.

The energy supply order has been secured by wholly-owned subsidiary JSW Neo Energy Limited, JSW Energy said, adding that the company received the letter of award following a tariff-based competitive bidding process.

PSU Watch is now on Whatsapp Channels. Click here to join

Bids were invited for supply of 630 MW of firm and dispatchable power from an inter state transmission system or ISTS-connected renewable energy project SECI-FDRE-IV, JSW Energy said in an exchange filing.

With the latest contract, the company's total locked-in generation capacity has increased to 16.4 GW, which includes a hybrid capacity of 2.3 GW, including FDRE (firm and dispatchable renewable energy).

The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

CIL allocates 11.77 MT coal out of 30.55 MT in April via e-auction

Govt planning policy to push floating solar projects: MNRE Secretary

Auto LPG sales jump over 100% m-o-m in April as daily consumption doubles: Govt data

Anugraha Narayana Das (IDAS) takes charge as Controller General of Defence Accounts

Power Secretary reviews SJVN hydro projects in Himachal