NHPC to begin commercial operation of 250 MW unit at Subansiri hydro project on Sunday File Photo
News Updates

NHPC to begin commercial operation of 250 MW unit at Subansiri hydro project on Sunday

NHPC will begin commercial operation of the third unit of its 2,000 MW Subansiri Lower Hydroelectric Project, being constructed at a cost of around Rs 27,000 crore, on Sunday

PSU Watch Bureau

New Delhi: State-owned NHPC Limited will begin commercial operation of the third unit of its 2,000 MW Subansiri Lower Hydroelectric Project, being constructed at a cost of around Rs 27,000 crore, on Sunday, according to an exchange filing.

PSU Watch is now on Whatsapp Channels. Click here to join

NHPC is constructing the hydroelectric project (having 8 units of 250 MW each) near North Lakhimpur on the border of Arunachal Pradesh and Assam.

"...NHPC declares commercial operation (CoD) of Unit3 (250 MW) of Subansiri Lower HE Project, 2000 MW (8 x 250 MW), Assam/Arunachal Pradesh from 00:00 hours on 01.02.2026...," the company said in an exchange filing on Friday.

Subansiri Lower HE Project is the largest hydroelectric project ever undertaken in India and is a run-of-river project with water storage on Subansiri.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

NTPC Talcher Kaniha equips 81 schools with desks under CSR initiative

BEL is looking to hire Director (Finance); apply before March 13

MCL invites job applications for Director (Personnel); apply before March 13

NCL conferred with Golden Peacock CSR Award 2025

NCL invited job applications for its CMD post; apply before March 13