NLC India Renewables bags 50 MW/200 MWh battery storage project in West Bengal 
News Updates

NLC India Renewables bags 50 MW/200 MWh battery storage project in West Bengal

NLC India Renewables has secured a 50 MW/200 MWh standalone battery energy storage system (BESS) project at Arambag in West Bengal’s Hooghly district

PSU Watch Bureau

New Delhi: NLC India Renewables Limited (NIRL), a wholly owned subsidiary of NLC India Limited, has secured a 50 MW/200 MWh standalone battery energy storage system (BESS) project at Arambag in West Bengal’s Hooghly district.

Follow The PSUWatch Channel on Whatsapp

In a regulatory filing dated October 14, NLC India said NIRL emerged as the successful bidder in a tender floated by the Department of Power, Government of West Bengal, on behalf of West Bengal State Electricity Distribution Company Limited (WBSEDCL).

The tender was issued for setting up standalone battery energy storage systems at multiple locations across West Bengal through tariff-based competitive bidding.

Follow PSU Watch on LinkedIN

Following the successful bid, NIRL has received a Letter of Award (LoA) from WBSEDCL for the development of the 50 MW/200 MWh project at Arambag.

The project marks a new order win for NLC India’s renewable energy subsidiary in the battery energy storage segment. However, the company’s filing did not disclose the project cost, execution timeline or commissioning schedule.

(PSU Watch is India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy. 👉 Click to join our channel now: PSUWatch WhatsApp Channel. Prefer LinkedIn? Follow PSU Watch on LinkedIN. Click to stay connected on Twitter here and stay updated.)

Rupee gains 31 paise to 94.86 against US dollar as RBI measures lend support

Sensex jumps 354 points, Nifty rebounds as IT stocks rally, crude prices ease

BEML, Czech Republic explore industrial and technology collaboration

Pugal solar park auction discovers Rs 3.42 tariff; Rajasthan ancillary services draft ‘very soon’: RRECL CMD

India on target to meet CEA’s 2030 battery storage projection: MNRE Additional Secretary