New Delhi: NTPC Limited has declared the commercial operation of the second part capacity of 34.4 MW out of its 176 MW Solar PV Project at Ramagundam in Telangana with effect from 00:00 hours of May 29. This information has been shared by the power PSU in a regulatory filing on Friday.
Follow PSU Watch on LinkedIN
Following the commissioning of the additional solar capacity, the total installed capacity of the NTPC Group has increased to 90,807 MW, while its commercial capacity now stands at 88,927 MW.
The Ramagundam Solar PV Project is part of NTPC’s broader renewable energy expansion strategy aimed at strengthening its clean energy portfolio and supporting India’s energy transition goals.
(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)