NTPC Group achieves fastest 400 BU power generation in FY'25 
News Updates

NTPC Group achieves fastest 400 BU power generation in FY'25

NTPC on Saturday said the group has achieved its fastest-ever generation of 400 Billion Units (BU) on March 1, 2025, in the FY 2024-25

PTI

New Delhi: State-run power giant NTPC on Saturday said the group has achieved its fastest-ever generation of 400 Billion Units (BU) on March 1, 2025, in the FY24-25.

This milestone was achieved in just 335 days, 12 days earlier as compared to the last financial year, a company statement said.

PSU Watch is now on Whatsapp Channels. Click here to join

In FY23-24, the company had crossed 400 BU generation on 13th March 2024.

NTPC Ltd, India’s largest integrated power utility, contributes one-fourth of the country's power requirements. It has an installed capacity of over 77 GW, with an additional capacity of 29.5 GW under construction, including 9.6 GW of renewable energy capacity.

The company is committed to achieving 60 GW of renewable energy capacity by 2032.

Along with power generation, NTPC has ventured into various new business areas, including e-mobility, battery storage, pumped hydro storage, waste-to-energy, nuclear power, and green hydrogen solutions. It has also participated in the bidding for power distribution of Union Territories.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Vivek Kumar Dewangan (IAS) appointed Secretary of NCSC

Rs 37,500-crore coal gasification scheme finds no applicants so far: Sources

Electrical fault trips all seven units at NTPC’s Korba plant during Power Grid breaker testing

SEFI urges Centre to create a 'mega' steel PSU by merging SAIL, RINL, NMDC Steel & MECON

Indian Oil-backed MC²+ IGNITE to fund up to 30 energy start-ups; top ventures eligible for Rs 1.5 crore