NTPC Renewable begins commercial electricity supply from Shajapur solar project Representative Image
News Updates

NTPC Renewable begins commercial electricity supply from Shajapur solar project

NTPC Renewable Energy has started commercial supply of electricity from the first part of 55MW at Shajapur solar project in Madhya Pradesh

PSU Watch Bureau

New Delhi: NTPC Green Energy on Thursday said its arm NTPC Renewable Energy has started commercial supply of electricity from the first part of 55MW at Shajapur solar project in Madhya Pradesh.

NTPC Green Energy Ltd is a subsidiary of state-run power giant NTPC Ltd.

PSU Watch is now on Whatsapp Channels. Click here to join

"Consequent upon successful commissioning, first part capacity of 55 MW out of 105 MW Shajapur Solar Project (Unit-I) at Shajapur, MP of NTPC Renewable Energy Ltd (a wholly-owned subsidiary of NTPC Green Energy Ltd), is declared on Commercial Operation with effect from 00:00 Hours of November 29, 2024," a BSE filing said.

In a separate filing the NTPC stated that with this, the total installed and commercial capacity of the NTPC group has now become 76,530.68 MW.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

IREDA reports 86% growth in loan sanctions, loan book rises to Rs 84,445 crore in H1 FY26

PM Surya Ghar Muft Bijli Yojana reaches 20 lakh households: Joshi

SJVN commissions 128.88 MW solar capacity at Bikaner project

BHEL gets two new orders worth Rs 13-15K crore

Puri inaugurates IGL’s new office and smart gas meter plant, highlights India’s clean energy strides