NTPC Renewable begins commercial electricity supply from Shajapur solar project Representative Image
News Updates

NTPC Renewable begins commercial electricity supply from Shajapur solar project

NTPC Renewable Energy has started commercial supply of electricity from the first part of 55MW at Shajapur solar project in Madhya Pradesh

PSU Watch Bureau

New Delhi: NTPC Green Energy on Thursday said its arm NTPC Renewable Energy has started commercial supply of electricity from the first part of 55MW at Shajapur solar project in Madhya Pradesh.

NTPC Green Energy Ltd is a subsidiary of state-run power giant NTPC Ltd.

PSU Watch is now on Whatsapp Channels. Click here to join

"Consequent upon successful commissioning, first part capacity of 55 MW out of 105 MW Shajapur Solar Project (Unit-I) at Shajapur, MP of NTPC Renewable Energy Ltd (a wholly-owned subsidiary of NTPC Green Energy Ltd), is declared on Commercial Operation with effect from 00:00 Hours of November 29, 2024," a BSE filing said.

In a separate filing the NTPC stated that with this, the total installed and commercial capacity of the NTPC group has now become 76,530.68 MW.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Robust testing, certification infra key to protect consumer interests: Pralhad Joshi

SEBI simplifies securities transfer process; approves new code of conduct for board members

Senior management reviews capacity expansion, digitalisation initiatives at Donimalai complex of NMDC

Green energy will power India's Viksit Bharat journey: IREDA CMD at PSU Summit

Over 70 lakh employed under PM-VBRY so far, says PM; transfers Rs 2,400-cr sops for 15 lakh jobs