NTPC Renewable starts commercial supply electricity from its solar project in Gujarat Representative Image
News Updates

NTPC Renewable starts commercial supply of electricity from its solar project in Gujarat

NTPC Renewable Energy has started commercial supply of 30 MW electricity from its 150 MW solar project in Mesanka, Gujarat

PSU Watch Bureau

New Delhi: State-owned power giant NTPC on Thursday said its step-down subsidiary NTPC Renewable Energy has started commercial supply of 30 MW electricity from its 150 MW solar project in Mesanka, Gujarat.

PSU Watch is now on Whatsapp Channels. Click here to join

"... The second part capacity of 30 MW out of 150 MW Gujarat Solar PV Project in Mesanka, Gujarat of NTPC Renewable Energy Ltd, a step-down subsidiary of NTPC through its subsidiary NTPC Green Energy Ltd, is declared on commercial operation with effect from 00:00 hours of 11.12.2024," the company said in a regulatory filing.

The first part capacity of 60 MW has already been declared on commercial operation (supply) from July 29, 2024, the filing added.

With this, the total installed and commercial capacity of NTPC group has now become 76,560.68 MW, the filing said.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Stock markets trade flat amid volatile trends

NLC India signs Rs 25,000-crore MoU with Gujarat Govt for RE projects

SECI achieves ‘Excellent’ rating in MoU performance for FY'25

SAIL's Rourkela Steel Plant sets new record in steel ladle lining life

UPI user base can more than double to 1 billion: RBI Deputy Governor