NTPC Renewable starts commercial supply electricity from its solar project in Gujarat Representative Image
News Updates

NTPC Renewable starts commercial supply of electricity from its solar project in Gujarat

NTPC Renewable Energy has started commercial supply of 30 MW electricity from its 150 MW solar project in Mesanka, Gujarat

PSU Watch Bureau

New Delhi: State-owned power giant NTPC on Thursday said its step-down subsidiary NTPC Renewable Energy has started commercial supply of 30 MW electricity from its 150 MW solar project in Mesanka, Gujarat.

PSU Watch is now on Whatsapp Channels. Click here to join

"... The second part capacity of 30 MW out of 150 MW Gujarat Solar PV Project in Mesanka, Gujarat of NTPC Renewable Energy Ltd, a step-down subsidiary of NTPC through its subsidiary NTPC Green Energy Ltd, is declared on commercial operation with effect from 00:00 hours of 11.12.2024," the company said in a regulatory filing.

The first part capacity of 60 MW has already been declared on commercial operation (supply) from July 29, 2024, the filing added.

With this, the total installed and commercial capacity of NTPC group has now become 76,560.68 MW, the filing said.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Exports growth in double digit in April-May: Official

Govt steps up El Nino preparedness; crop watch groups formed, fertiliser stocks at 51%

Arunachal Govt launches 5th edition of entrepreneurship development programme

RITES inaugurates new regional office ‘Kshitij’ in Lucknow

Jose V J gets three-month extension as CSL CMD