NTPC Renewable to begin 130.47 MW commercial supply from Khavda-I solar project from midnight Image for representation only
News Updates

NTPC Renewable to begin 130.47 MW commercial supply from Khavda-I solar project from midnight

NTPC Renewable Energy will begin commercial electricity supply of 130.47 MW from its 1,255 MW Khavda-I solar project in Gujarat from Wednesday midnight

PSU Watch Bureau

New Delhi: State-owned power giant NTPC's step-down arm NTPC Renewable Energy will begin commercial electricity supply of 130.47 MW from its 1,255 MW Khavda-I solar project in Gujarat from Wednesday midnight.

PSU Watch is now on Whatsapp Channels. Click here to join

NTPC Renewable Energy is an arm of NTPC Green Energy Ltd.

The current commercial capacity of NTPC Green Energy Group stands at 8,347.78 MW, according to a regulatory filing.

With the addition of this capacity, the total installed capacity of the NTPC Green Energy Group will increase to 8,478.25 MW.

The tenth part capacity of 130.47 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat under CPSU scheme Phase-II Tranche III of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited, is declared on Commercial Operation with effect from 00:00 hours of January 29, 2026.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

CAG exposes critical flaws in MeitY skill schemes: Multiple enrolments, low placements, data gaps

West Asia crisis: As OMCs bleed cash, windfall tax on ATF, diesel exports do not apply to Reliance's SEZ refinery

NALCO posts record production, sales surpassing 40-year history

CAG raps India Post Payments Bank: Unverified accounts, 362-Hour UPI outages exposed

Captive, commercial coal output rises 10.22% to 210.46 MT in FY26; despatch up 7.35%