NTPC to start commercial operation of 167 MW capacity at Nokh Solar project Representative Image
News Updates

NTPC to start commercial operation of 167 MW capacity at Nokh Solar project

NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday

PSU Watch Bureau

New Delhi: NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday.

With this, the total installed and commercial capacity of NTPC on a standalone and group basis will now become 60,705 MW and 83,863 MW, respectively, the company said in an exchange filing on Thursday.

PSU Watch is now on Whatsapp Channels. Click here to join

"Consequent upon successful commissioning, 167 MW out of 245 MW capacity at Plot-1 of NTPC's Nokh Solar PV Project (3x245MW), Rajasthan, is declared on commercial operation w.e.f. 00:00 Hrs. of September 26, 2025," it added.

NTPC, under the Ministry of Power, is India's largest power generating player, catering to the country's around 1/4rth demand of electricity.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Tarun Kumar Pithode (IAS) takes charge as Member Secretary of CAQM

India, Germany discuss ways to increase cooperation in trade, investment

205 energy projects facing cost-overrun of Rs 1.34 lakh cr; oil & gas, power T&D projects face most delays: MoSPI

Some teething issues persist in new cheque clearing system: NPCI

PESB finds no suitable candidate for AAI's Member (Operations) post