NTPC to start commercial operation of 167 MW capacity at Nokh Solar project Representative Image
News Updates

NTPC to start commercial operation of 167 MW capacity at Nokh Solar project

NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday

PSU Watch Bureau

New Delhi: NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday.

With this, the total installed and commercial capacity of NTPC on a standalone and group basis will now become 60,705 MW and 83,863 MW, respectively, the company said in an exchange filing on Thursday.

PSU Watch is now on Whatsapp Channels. Click here to join

"Consequent upon successful commissioning, 167 MW out of 245 MW capacity at Plot-1 of NTPC's Nokh Solar PV Project (3x245MW), Rajasthan, is declared on commercial operation w.e.f. 00:00 Hrs. of September 26, 2025," it added.

NTPC, under the Ministry of Power, is India's largest power generating player, catering to the country's around 1/4rth demand of electricity.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Kolkata Metro to increase Purple Line services, operating from 6.40 am to 9.26 pm

Bank unions pitch for regular jobs rather than contractual ones

UP Govt to provide 40,521 subsidised solar pumps to farmers in FY26

FinMin, RBI working on portal to help citizens claim unclaimed assets: DFS Secy

SC to consider plea for listing petitions of states in minerals royalty case