NTPC to start commercial operation of 167 MW capacity at Nokh Solar project Representative Image
News Updates

NTPC to start commercial operation of 167 MW capacity at Nokh Solar project

NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday

PSU Watch Bureau

New Delhi: NTPC Limited will start commercial operations of 167 MW at plot 1 of the Nokh Solar Project in Rajasthan from Friday.

With this, the total installed and commercial capacity of NTPC on a standalone and group basis will now become 60,705 MW and 83,863 MW, respectively, the company said in an exchange filing on Thursday.

PSU Watch is now on Whatsapp Channels. Click here to join

"Consequent upon successful commissioning, 167 MW out of 245 MW capacity at Plot-1 of NTPC's Nokh Solar PV Project (3x245MW), Rajasthan, is declared on commercial operation w.e.f. 00:00 Hrs. of September 26, 2025," it added.

NTPC, under the Ministry of Power, is India's largest power generating player, catering to the country's around 1/4rth demand of electricity.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

GAIL reports net profit of Rs 5,706 crore for nine months of FY'26

Leadership Transition at HSL: Cmde Girideep Singh, superannuates; Capt. Ganti Venkateswarlu assumes additional charge as C&MD

NALCO posts record Rs 1,601 crore net profit in Q3 FY26; nine-month profit touches all-time high of Rs 4,098 crore

If firm profits more from its scale, it has to bear more responsibility for environmental costs: SC

BoB Q3 net profit inches up 4.39%, lowers FY26 credit costs as asset quality holding up