Power Grid wins inter-state transmission project in MP Under TBCB 
News Updates

Power Grid wins inter-state transmission project in MP Under TBCB

Power Grid has been declared the successful bidder for an inter-state transmission project under the Tariff-Based Competitive Bidding (TBCB) process

PSU Watch Bureau

New Delhi: Power Grid Corporation of India Limited (PGCIL), a central public sector undertaking under the Ministry of Power, has been declared the successful bidder for an inter-state transmission project under the Tariff-Based Competitive Bidding (TBCB) process.

The project, titled “Transmission System for Evacuation of Power from Mahan Energen Limited Generating Station in Madhya Pradesh,” will be developed on a Build, Own, Operate, and Transfer (BOOT) basis.

PSU Watch is now on Whatsapp Channels. Click here to join

According to the company’s filing with stock exchanges, Power Grid received the Letter of Intent (LoI) on April 1, 2025, after being declared the winning bidder. The transmission project includes the construction of a 400kV double-circuit (D/C) transmission line and associated bays at the existing Rewa Power Station (PG) substation in Madhya Pradesh.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Administrative approval under consideration for Sawalkote Hydroelectric Project in J&K: Lal

BDL secures additional defence orders worth Rs 2,461.62 crore from Indian Army

Industrial output growth at 13-month low of 0.4% in Oct

Govt directs Wireless Monitoring Organisation to identify source of GPS spoofing at airports

AAI conducting audit of communication, navigation, surveillance equipment at all airports