SECI invites bids for 400 MWp solar module with cell manufacturing, supply project 
News Updates

SECI invites bids for 400 MWp solar modules with cell manufacturing, supply project

SECI has invited bids for manufacturing and supply of 400 mega watt peak (MWp) of solar modules with cells

PSU Watch Bureau

New Delhi: State-owned Solar Energy Corporation of India (SECI) has invited bids for manufacturing and supply of 400 mega watt peak (MWp) of solar modules with cells.

The tender also includes testing, packing and transportation of domestically manufactured solar PV modules with cells, SECI said in a notice dated November 14.

PSU Watch is now on Whatsapp Channels. Click here to join

The last date to submit online bids is December 12 till 2 pm, SECI said.

The opening of techno-commercial bids has been scheduled for same day at 4 pm.

A pre-bid meeting has been scheduled on November 20.

Solar Energy Corporation of India Limited (SECI) is a nodal agency of the central government for auctioning renewable energy projects in India.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

IOC to get Rs 14,486 cr compensation; revenue to be recognised over 12 months

Power Grid observes Vigilance Awareness Week across India

Titagarh Rail Systems bags Rs 2,481 crore order from MMRDA for Mumbai Metro Line 5

Abhishek Swami is set to be next Director (Finance) of MRVC

Amit Yadav (IAS) assigned additional charge as Secretary of DEPwD