Uttrakhand's broad gauge of 317 kms gets electrified 
News Updates

Uttrakhand's broad gauge of 317 kms gets electrified

Indian Railways has completed 100 percent electrification of Uttarakhand's broad gauge of around 347 kilometres on Monday

PSU Watch Bureau

New Delhi: Indian Railways has completed 100 percent electrification of Uttarakhand's broad gauge of around 347 kilometres on Monday, said the Ministry in a statement. Further, it added that the electrification of this route will lead to saving in account of reduced line haul cost (about 2.5 times lower), heavier haulage capacity, increased sectional capacity, reduced operating and maintenance cost of electric loco, energy efficient and eco-friendly mode of transportation with reduced dependence on imported crude oil, saving of foreign exchange. 

A new line from Rishikesh to Karnaprayag is under construction

"Further, Rishikesh to Karnprayag, a new line work is under construction which will be another landmark achievement of Indian Railways, bringing Char Dham pilgrimage route on Indian Railways’ circuit. This route is sanctioned along with electrification, in sync with Railways’ policy of 100 percent electrified network," the statement added.  

"Uttarakhand falls under the Northern and North-Eastern Railway’s jurisdiction. Some of the major railway stations in Uttarakhand are Dehradun, Haridwar, Roorkee, Rishikesh, Kathgodam and Tanakpur.  Some of them have religious importance and some are tourist attractive places. Badrinath, Kedarnath, Yamunotri, Gangotri, Hemkund Sahib, Mussoorie, Nainital, Jim Corbett and Haridwar are a few to name. Kathgodam station is an important station with annual passenger footfall of about seven lakhs and this terminating station acts as entry of Kumaun region of Uttrakhand," it added. 

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Govt says 649 air routes connected under UDAN; scheme to continue beyond Apr 2027

Govt asks utilities to carry out maintenance after CEA detects failure in 75 EHV transmission towers

Jio-BP clocks 34% volume growth in petrol, diesel sales

Punjab Engineering College confers honorary Doctorate on Power Grid CMD

Australian water delegation explores collaboration opportunities with Indian water industry