Dr Yatindra Dwivedi assumes charge as Director (Personnel) of Power Grid File Photo
PSU Appointments

Dr Yatindra Dwivedi assumes charge as Director (Personnel) of Power Grid

Dr Yatindra Dwivedi has assumed the charge of Director (Personnel) of Power Grid on August 31

PSU Watch Bureau

New Delhi: Dr Yatindra Dwivedi has assumed the charge of Director (Personnel) of Power Grid Corporation of India Limited (PGCIL) on August 31. Prior to his joining as Director (Personnel), he worked as Executive Director (HR) handling challenging and flagship works & delivered results consistently in dynamic business environment.

Dr Dwivedi is a seasoned leader with demonstrated experience of more than 33 years. He has played a pivotal role in allignment of HR Strategy with business and steering organisation’s growth.

Dr Dwivedi is a business enabler with excellent cross functional knowledge, high acumen and great exposure in policy formulations, HR Process Re-engineering and other organisational development initiatives. He started his professional journey with Hindalco Industries and joined Power Grid in 1993.

Dr Dwivedi has led various change management initiatives such as SAP implementation, digitization of HR, readiness for future of work etc. with a focus on building an agile & resilient organisation.

Dr Dwivedi holds Bachelor’s degree in engineering from IIT Roorkee, PGDIE from NITIE Mumbai (now IIM Mumbai), PGDM from MDI Gurgaon and Doctorate in Management.

He has represented India and won the prestigious Asian Management Challenge Championship in 2017.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

‘Nobody takes the sun away’: ISA members see solar & storage as energy security post West Asia crisis, says DG

BPCL launches high-octane petrol 'SPEED 100' in Indore, plans expansion to six more outlets

SJVN CMD reviews 900 MW Arun-3 project, prepares ground for Lower Arun construction in Nepal

Balmer Lawrie Q2 FY'27 net profit rises 40% to Rs 67.66 crore

NTPC eyes 149 GW installed capacity by 2032: Chairman Gurdeep Singh