Delhi-Srinagar highway will increase tourist arrivals in J&K 4-fold: Gadkari

There will be a four-fold rise in the footfall of tourists in Kashmir after the completion of the Delhi-Jammu-Srinagar highway, said Gadkari
Gadkari
Gadkari

Banihal/Jammu: There will be a four-fold rise in the footfall of tourists in Kashmir after the completion of the Delhi-Jammu-Srinagar highway, Union Minister Nitin Gadkari has said. The minister for road, highways, and transport on Tuesday inspected a 924-metre-long Banihal-Qazigund tunnel, which will bypass a nearly three-km landslide and accident-prone area in Ramban district, and various road projects in the Union territory.
The completion of the tunnel will bring much relief to travellers by bypassing a nearly three-km landslide and accident-prone area in the Ramban district.

Tourist arrival will increase over 4 times after completion of this road: Gadkari

Flanked by Lieutenant Governor Manoj Sinha and Union ministers Jitendra Singh and General VK Singh, Gadkari also conducted a breakthrough of Sita Rama Passi Maroog via virtual mode through a controlled blast in the tunnel. "After completion of this road in the next two years, the tourist arrival (in Jammu and Kashmir) will increase over four times. It will increase the number of resorts and restaurants in the Union territory," Gadkari said after an inspection of the tunnel.

The minister expressed confidence that after the completion of road projects, there will be a huge development, people will get employment and poverty will be eradicated in the Union territory. "The lifeline (highway) will have socio-economic benefits to Jammu and Kashmir. In Jammu and Kashmir, we are constructing road projects at a cost of Rs 1.25 lakh crore. There are 20 to 22 proposals of ropeways and cable cars worth Rs 25,000-30,000 crores that we are doing. It will have a four-fold increase in the tourism of Jammu and Kashmir. Jammu and Kashmir will be self-reliant and prosperous," he said.

'There will be 3 roads being constructed between Jammu & Srinagar'

Referring to the work on the highways, he said that there will be three roads being constructed between Jammu and Srinagar. "One of five tunnels with a length of 45 kilometres has been inaugurated today. The other three tunnels will be open by next year. One tunnel given to TATA will take some time for completion," he said.

Tunnel project has been given to Tata: Gadkari

Referring to the express highway, he said that a tunnel project has been given to TATA. "It will take some time. After completion, the distance will be restricted to three hours. From Katra, it will be direct travel to Delhi. The travel time from Delhi to Srinagar will be 8 hours and six hours travel time from Delhi to Katra. From Delhi to Mumbai, the travel time will be 12 hours," the minister said.

Responding to the locals' demands for employment, he said, "We are building a resort, where we can put handloom and handicrafts products of locals for display. It will give employment to 500 to 600 people." He also said that 99 percent of the tunnel staff has been employed locally.
"We will keep trying that local youth get jobs in other tunnels too, and Jammu and Kashmir become self-reliant in terms of economic growth," he added.

'Every tunnel saves times'


Gadkari inspected highways, the Banihal bypass, and the Peera-Chanderkote tunnel. "Every tunnel saves time. Today, this tunnel was completed another tunnel will be completed soon. Within two months, it will also be started," he said.

The tunnel is part of the ongoing four-laning of the 270-km Jammu-Srinagar national highway - the only all-weather road linking Kashmir with the rest of the country. The tunnel bypasses the most vulnerable stretch of Panthyal in the Ramban district. The work on the four-laning project started in 2011 and includes a number of small and major tunnels, bridges, and flyovers. The project is likely to be completed by the next year after missing several deadlines over the past decade.

Asked about the second tube (T2) of the Kunfer tunnel, he said that it will be ready within two months. The completion of these projects will not only help resolve the issue of traffic jams on the highway to a large extent but will also cut down the distance between different points by several kilometres. "To ease the travel between Jammu and Srinagar, three corridors are being built at a cost of Rs 35,000 crore. Under this, the first corridor from Jammu to Udhampur-Ramban-Banihal and further to Srinagar," Gadkari said.

This four-lane road of 250 km length is being built at a cost of Rs 16,000 crore. Out of this, four-laning of 210 km route has been completed, including 10 tunnels of 21.5 km, he said. The minister also said that the government is constructing a multi-model hub of world standards at Katra, the base camp of the cave shrine of Mata Vaishnodevi. "It will be an attraction for the world. It has got a beautiful design. We are also going there," he added.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

logo
PSU Watch
psuwatch.com