

New Delhi: The National Highways Authority of India (NHAI) has received 32 bids across four construction packages for the proposed Ganga and Varuna elevated corridor projects in Varanasi, indicating strong participation from highway developers.
The two projects, with a combined length of approximately 89.2 km and a total capital cost of Rs 25,445.96 crore, aim to ease traffic congestion and improve connectivity to key religious, cultural and transportation hubs in Varanasi and adjoining areas.
The 43.2-km Varuna Elevated Corridor, connecting NH-31 with Varanasi Ring Road, received 15 bids across its two packages. The project has an estimated capital cost of Rs 10,998.32 crore.
The 46-km Ganga Elevated Corridor, connecting NH-19 with Varanasi Ring Road along the Ganga, received 17 bids across its two packages. It has an estimated capital cost of Rs 14,447.64 crore.
Both projects will be implemented under the Hybrid Annuity Model (HAM). They are designed for operating speeds of 80–100 km per hour and are expected to significantly reduce travel time across key routes in Varanasi.
The Varuna corridor is expected to reduce travel time between NH-31 and Kashi Railway Station from around 40 minutes to 20 minutes, while the Ganga corridor will cut travel time between NH-19 and Varanasi Ring Road from approximately 60 minutes to 20 minutes.
The projects were approved by the Cabinet Committee on Economic Affairs in July 2026.
(PSU Watch is India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy. 👉 Click to join our channel now: PSUWatch WhatsApp Channel. Prefer LinkedIn? Follow PSU Watch on LinkedIN. Click to stay connected on Twitter here and stay updated)