NTPC commissions additional solar capacities at Khavda; total installed capacity reaches 89,057 MW

NTPC Limited on Tuesday announced the commissioning of additional solar power capacities at its Khavda projects in Gujarat
Alt="NTPC Limited"
NTPC commissions additional solar capacities at Khavda; total installed capacity reaches 89,057 MWPSU Watch
Published on

New Delhi: NTPC Limited on Tuesday announced the commissioning of additional solar power capacities at its Khavda projects in Gujarat, taking the total installed capacity of the NTPC Group to 89,057 MW.

Follow The PSUWatch Channel on WhatsApp

According to the filing, NTPC Renewable Energy Limited, a step-down subsidiary, has declared the Commercial Operation Date (COD) for two solar project capacities effective March 31, 2026.

The company has commissioned the 12th and final part capacity of 78.02 MW out of the 1,255 MW Khavda-I Solar PV Project. Additionally, the sixth part capacity of 90 MW out of the 1,200 MW Khavda-II Solar PV Project has also been made operational.

Follow PSU Watch on LinkedIN

Alt="NTPC Limited"
BHEL bags Rs 13,500 crore order from NTPC for Telangana thermal power project

With the latest additions, NTPC’s commercial capacity has reached 87,977 MW, further strengthening its renewable energy portfolio as the company continues to scale up its green energy footprint.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

logo
PSU Watch
psuwatch.com