NTPC REL commissions 50MW MP solar project, group capacity reaches 77,461 MW

The first part capacity of 55 MW of NTPC Shajapur solar project in Madhya Pradesh has already been declared on commercial operation on November 29, 2024
Alt="NTPC REL Shajapur Solar Project"
NTPC commissions second and last part of 50MW MP solar projectPW/AI-gen
Published on

New Delhi: NTPC has commissioned a 50 MW unit of Shajapur solar project in Madhya Pradesh, taking the group's total installed and commercial capacity to 77,461.50 MW, a BSE filing said on Wednesday.

"Second and last part capacity of 50 MW out of 105 MW Shajapur Solar Project (Unit-I) in Shajapur Solar Park, M.P of NTPC Renewable Energy Limited (NTPC REL) is declared on commercial operation," NTPC said in the filing.

PSU Watch is now on Whatsapp Channels. Click here to join

The first part capacity of 55 MW has already been declared on commercial operation on November 29, 2024.

With this, the total installed and commercial capacity of NTPC group has now become 77,461.50 MW, the company further said in the filing.

Alt="NTPC REL Shajapur Solar Project"
CCI clears ONGC-NTPC Green's proposal to acquire Ayana for Rs 19,500 crore

NTPC REL is a stepdown subsidiary of NTPC Limited, which is India's largest power generation company operating under the Ministry of Power. NTPC Group includes the joint ventures and subsidiaries.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

logo
PSU Watch
psuwatch.com