NTPC announces commercial operation of 5th part of 48.8 MW at its 296 MW Fatehgarh Solar PV Project

NTPC Limited on Friday announced the commercial operation of the 5th and final part of 48.8 MW at its 296 MW Fatehgarh Solar PV Project
NTPC announces commercial operation of 5th part of 48.8 MW at its 296 MW Fatehgarh Solar PV Project
NTPC announces commercial operation of 5th part of 48.8 MW at its 296 MW Fatehgarh Solar PV Project
Published on

New Delhi: Maharatna Power PSU NTPC Limited on Friday announced the commercial operation of the 5th and final part of 48.8 MW at its 296 MW Fatehgarh Solar PV Project. With the deceleration of commercial operation at the last part of the project, 296 MW Fatehgarh Solar Project, Rajasthan is now fully operational. This information has been shared by the power giant in a regulatory filing to the stock exchange on Friday.

"Consequent upon successful commissioning, the fifth part capacity of 48.8 MW out of 296 MW Fatehgarh Solar PV Project at Jaisalmer, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 05.08.2022. Now, the full capacity of 296 MW has been commissioned," NTPC said in a regulatory filing to the stock exchange.

With this, the standalone installed and commercial capacity of NTPC has become 54,818 MW, while the group installed and commercial capacity of NTPC has become 69,183 MW.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

logo
PSU Watch
psuwatch.com