Sunday, May 15, 2022
- Advertisement -spot_img

TAG

Reforms-Linked Result-Based Scheme for Distribution

Genus can double manufacturing of smart meters in 6 months, if required: JMD

Genus Power has designed its infrastructure in a way that will enable it to double its smart meter manufacturing capacity within 6 months, if required, its Joint Managing Director said

Latest news

- Advertisement -spot_img