NTPC’s 1,320 MW Tanda STPS Stage-II is set to be fully operational as the second unit of the power station is going to start commercial operations on July 1
With successful completion of the trial operation by Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station in Uttar Pradesh, the NTPC Group installed capacity has risen to 65,810 MW