JSW Energy 
Corporate Watch

JSW Energy commissions 51 MW wind project in Tamil Nadu

JSW Energy on Friday announced the commissioning of a 51-megawatt (MW) wind energy project in Tamil Nadu by one of its step-down subsidiaries

PSU Watch Bureau

New Delhi: JSW Energy on Friday announced the commissioning of a 51-megawatt (MW) wind energy project in Tamil Nadu by one of its step-down subsidiaries. "JSW Renew Energy Two Limited has commissioned 51 MW of wind power capacity under phase-wise commissioning of 450 MW ISTS-connected wind power project awarded under SECI tranche X in Tamil Nadu," JSW Energy said in a regulatory filing.

Total current installed capacity of company has reached 6,615 MW

Subsequent to this, the total current installed capacity of the company has reached 6,615 MW while the under-construction capacity stands at 2,855 MW, which is likely to be commissioned in phases over the next 12-18 months, it said.

JSW Energy has a target to reach 20 GW capacity by 2030

JSW Energy has a target to reach 20 GW capacity by 2030 and a near-term target of 10 GW by 2025. The company has also made a foray into energy storage space and is currently locked in 3.4 GWh of energy storage capacity by means of a battery energy storage system and hydro-pumped storage plant.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

BES 2026: REC, PFC host vendor development session

HSL drives strong industry engagement at Defence Conclave

BES 2026: CEOs underscore urgency of reforms in DISCOMs to ensure financial viability

Khattar calls for raising India's per capita power use, expediting RE transition amid global uncertainty

Premium petrol price up Rs 2, industrial diesel up Rs 22; no change in normal petrol, diesel rates