BHEL secures Rs 2,600 crore order from MB Power for 800 MW Anuppur Thermal Power Project 
News Updates

BHEL secures Rs 2,600 crore order from MB Power for 800 MW Anuppur Thermal Power Project

BHEL has announced that it has received a Letter of Intent (LOI) from MB Power Limited for the supply of equipment for its upcoming 1x800 MW Anuppur Thermal Power Project in Madhya Pradesh

PSU Watch Bureau

New Delhi: Bharat Heavy Electricals Limited (BHEL) has announced that it has received a Letter of Intent (LOI) from MB Power (Madhya Pradesh) Limited for the supply of equipment for its upcoming 1x800 MW Anuppur Thermal Power Project in Madhya Pradesh.

PSU Watch is now on Whatsapp Channels. Click here to join

The order, valued at approximately Rs 2,600 crore (excluding GST), involves the supply of a Boiler, Turbine, Generator, and associated auxiliaries, along with control and instrumentation systems. The project will be based on supercritical technology.

According to BHEL, the Boiler will be manufactured at its Trichy facility, while the Turbine and Generator will be produced at its Haridwar plant. The execution timeline for supply is 58 months.

The company confirmed that the contract has been awarded by a domestic entity and does not fall under related party transactions. A formal contract agreement is expected to be signed shortly.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

IndiGo flight disruptions: Panel submits probe report to DGCA

PNB reports Rs 2,434 crore loan fraud against erstwhile promoters of Srei Group to RBI

India engaged with US to find mutually beneficial trade pact: Kwatra

CESL concludes largest mega tenders for 10,900 e-buses under PM E-Drive Scheme

Forex reserves rise by $4.36 billion to $693 billion