Nepal preparing to sign MoU with NHPC & VUCL to develop hydropower project 
News Updates

Nepal preparing to sign MoU with NHPC & VUCL to develop hydropower project

PSU Watch Bureau

Kathmandu: Nepal is preparing an MoU in which India's hydroelectric major NHPC will collaborate with state-run VUCL to develop a 480 MW semi-reservoir hydropower project in the western part of the country at an estimated cost of Rs 92 billion, an official said on Friday. The move comes days after Nepal and India inked an agreement to increase the power import and export capacity through the Dhalkebar-Muzaffarpur transmission line from 600 MW to 800 MW.

'NHPC to collaborate with VUCL to develop hydropower project'

"Our government has asked NHPC (National Hydroelectric Power Corporation), a government of India company, to collaborate with Nepal's Vidyut Utpadan Company Ltd (VUCL), to develop a hydropower project," said Baburaj Adhikari, information officer at the Ministry of Energy, Water Resources and Irrigation.

'Nepal government is planning for a 51:49 NHPC-VUCL joint venture'

According to the draft MoU, the Nepal government is planning for a 51:49 NHPC-VUCL joint venture. If this MoU gets inked, the Phukot Karnali Hydropower Project, which is a semi-reservoir project with a capacity of 480 MW, will be constructed in Sani Triveni Rural Municipality-1 of Kalikot district in Nepal. The feasibility study of the project has been completed, Adhikari said.

Estimated cost of the project is worth Rs 92 bn: Adhikari

A 520-metre test tunnel was dug, and a plan to construct a 160-metre-high dam in Sisnegada of Sani Triveni Rural Municipality-3 and channel it through a 13.5 km tunnel to the power plant that would be constructed in Bhautegada of Sani Triveni Rural Municipality, Adhikari said.

"The estimated cost of this project is around Rs 92 billion, which is expected to be completed within five years after the start of construction," he explained.

Nepal will get free energy on monthly basis from the project

The draft of a Memorandum of Understanding (MOU) for investment with Nepali companies was being prepared, he said. According to the draft MoU, Nepal will get 21.9 percent free energy monthly from the project.

In it, NHPC will have to manage the market of the electricity generated from the project and the loan required to build the project on behalf of the promoter company.

Surplus electricity produced by project will be exported to India

If Nepal wants to consume the electricity of the project by itself, it will have the right to buy it, it said. The project's surplus electricity will be exported to India, it added. Nepal became an energy surplus country ever since the 456MW Upper Tamakoshi Hydropower Project came into operation in August last year.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Sept set to be busiest month for IPOs in 14 years: RBI Bulletin

India's forex reserves rise $223 million to a fresh high of $689.45 million

FM Sitharaman reviews capex plan of Housing and Urban Affairs Ministry

Sterlite Copper partners with Green Line Mobility to deploy LNG vehicles

Over Rs 3 lakh crore needed each year to achieve 440 GW RE capacity by 2030: ICRA