NHPC declares commercial operation of 53.57 MW at Karnisar Solar Project in Bikaner PSUWatch
News Updates

NHPC declares commercial operation of 53.57 MW at Karnisar Solar Project in Bikaner

NHPC has declared the commercial operation of an additional 53.57 MW capacity under the 300 MW Karnisar Solar Power Project located in Bikaner, Rajasthan

PSU Watch Bureau

New Delhi: NHPC Limited, India’s premier hydropower company and a leader in the renewable energy sector, has declared the commercial operation of an additional 53.57 MW capacity under the 300 MW Karnisar Solar Power Project located in Bikaner, Rajasthan.

PSU Watch is now on Whatsapp Channels. Click here to join

The latest declaration follows the successful completion of trial operations on June 5, 2025, and marks the commencement of commercial operations of the third phase from June 7, 2025. With this, the cumulative commercial capacity commissioned at the Karnisar site has reached 160.71 MW out of the planned 300 MW.

This disclosure has been made in a regulotry filing to the stock exchnages on June 8. NHPC has stated that the balance capacity will be brought online in due course.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Rupee falls 17 paise to 95.43 against US dollar in early trade

Stock markets turn flat after falling in early trade

Ebola Virus: DGCA asks airlines make in-flight announcements, take other measures

CONCOR’s FY26 profit dips 3.9% despite revenue growth; board declares dividend payout

BSNL revenue rises despite cheaper tariff than private telcos: MoS Telecom