NTPC Renewable Energy begins 300 MW commercial supply from 500 MW Bhadla solar project Image for representation only
News Updates

NTPC Renewable Energy begins 300 MW commercial supply from 500 MW Bhadla solar project

NTPC Renewable Energy has begun commercial supply of 300 MW of electricity from its 500 MW Bhadla solar project in Rajasthan from January 13

PSU Watch Bureau

New Delhi: State-run power giant NTPC Limited on Thursday said its step-down arm NTPC Renewable Energy has begun commercial supply of 300 MW of electricity from its 500 MW Bhadla solar project in Rajasthan from January 13.

PSU Watch is now on Whatsapp Channels. Click here to join

With this, the total installed and commercial capacity of NTPC group will become 87,287 MW and 86,207 MW, respectively, a regulatory filing stated.

According to a filing, NTPC informed the bourses about declaration of the COD (commercial operation date) for the first part capacity of 300 MW out of the 500 MW Bhadla Solar PV Project in Rajasthan.

This project is being implemented by NTPC Renewable Energy Ltd, a step-down subsidiary of NTPC Ltd, through its subsidiary NGEL, with effect from January 13, 2026.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

SEBI rationalises KYC norms for FPIs, extends review period to up to 8 years

Bank of Baroda Q2 profit up 31% to Rs 6,737 cr on NSE stake-sale

RBI central board reviews prevailing economic conditions

Adani Energy Solutions gets CCI nod to acquire IntelliSmart Infrastructure

TRAI proposes board-approved AI policies, mandatory reporting of serious incidents by telcos