THDC commissions 2nd Unit of Tehri PSP, commercial capacity reaches 2,747 MW 
News Updates

THDC commissions 2nd Unit of Tehri PSP

With the commissioning of its second unit, the total installed and commercial capacity of THDC India Limited now stands at 2,747 MW

PSU Watch Bureau

New Delhi: THDC India Limited, a power PSU and subsidiary of NTPC Limited, has announced the successful commissioning and commencement of commercial operations of Unit-II (250 MW) of the Tehri Pumped Storage Plant (PSP), marking another significant step in strengthening India’s hydro power capacity.

PSU Watch is now on Whatsapp Channels. Click here to join

The 4x250 MW Tehri PSP project is a key component of THDC’s renewable energy portfolio. With the commissioning of its second unit, the total installed and commercial capacity of THDC India Limited now stands at 2,747 MW.

According to an official filing made by the company on July 8, 2025, the Unit-II of Tehri PSP will be considered commercially operational from 00:00 hours of July 10, 2025, following all necessary approvals and successful commissioning.

The Tehri PSP is designed to provide peak load support and grid stability, enabling better integration of renewable energy sources into the national grid. It plays a crucial role in managing power demand fluctuations and advancing India’s energy transition goals.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

ONGC takes operational control of Mori-5 well as flame intensity eases after gas leak

Stock markets trade lower on persistent foreign fund outflows, trade uncertainties

HUDCO signs Rs 1 lakh crore MoU with Govt of Chhattisgarh for housing, urban infrastructure development

BPCL awards 2 major contracts to Technip Energies for Bina and Mumbai Refineries

India: A solar superpower with a fragile spine