Mumbai-Pune Missing Link to have India's highest road cable-stayed bridge 
Press Releases

Mumbai-Pune Missing Link to have India’s highest road cable-stayed bridge

Afcons has said that it is building the country's highest road cable-stayed bridge on the Mumbai-Pune Expressway Missing Link project

PSU Watch Bureau

Mumbai: Infrastructure company Afcons on Thursday said it is building the country's highest road cable-stayed bridge on the Mumbai-Pune Expressway Missing Link project. The 132-metre high bridge will be 650 metres long and will be the highest for any road project in the country, according to an official statement.

Afcons is executing the package-II of the 19-km missing link project, and the package comprises widening of the existing expressway from six lanes to eight lanes, construction of two viaducts, including a cable-stayed bridge in one of the viaducts, approach roads and slip roads.

The missing link, which will take motorists from Khopoli directly to the Sinhagad Institute ahead of Lonavala will reduce the distance of the expressway by 6 km and is aimed for completion by 2024.

Afcons' project manager Ranjit Jha said at present, construction work of the foundation, piers and pylons is being undertaken.

The project faces various geological, transportation, and extreme engineering challenges. For the widening of the existing expressway from six lanes to eight lanes, blasting for hill cutting has to be carried out in allotted slots by the authorities, the statement said.

The package-2 includes widening of 5.86 km existing expressway, including lanes, bridges, vehicular and passenger underpasses, construction of 10.2 km of approach roads and the bridge, the Afcons statement said.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Braithwaite CMD Md Asad Alam resigns on health grounds; Railway Board waives off notice period

SAIL posts strong sales growth in Apr–Nov 2025 period

PESB names Prem Singh Meena for RITES’ Director (Projects) post

PFC transfers wholly owned subsidiary KPS III HVDC Transmission to Adani Energy Solutions

NLC India, PTC India form JV to develop 2,000 MW of green energy projects