NTPC's commercial operational capacity crosses 85.5 GW Energy Watch
News Updates

NTPC's commercial operational capacity crosses 85.5 GW

NTPC has announced commercial capacity addition of 359.58 MW through various solar projects of its subsidiaries in Gujarat and Rajasthan

PSU Watch Bureau

New Delhi: Power giant NTPC on Wednesday announced commercial capacity addition of 359.58 MW through various solar projects of its subsidiaries in Gujarat and Rajasthan, taking the overall commercial capacity over 85.5 GW at the Group level.

PSU Watch is now on Whatsapp Channels. Click here to join

NTPC declared the commercial operation date (COD) of part capacity of 243.66 MW out of 1,255 MW Khavda-I Solar PV project of NTPC Renewable Energy, a step-down subsidiary of NTPC, through its subsidiary NGEL.

Further, the company declared COD of 78 MW out of 245 MW capacity of NTPC's Nokh Sokar PV project ( 3x 245 MW) in Rajasthan.

The company has also declared COD of part of the capacity of 37.925 MW out of 300 MW at Khavda Solar Energy Project under the 450 MW Hybrid Tranche V project of NTPC REL.

With this, the total installed and commercial capacity of the NTPC group has reached 85,541 MW.

The company has another 30.90 GW under construction, including 13.3 GW of renewable energy capacity.

NTPC, under the Ministry of Power, is India's largest power generation player, catering to the country's one/fourth electricity demand alone through conventional and renewable sources.

The company has ventured into various new business areas, including e-mobility, battery storage, pumped hydro storage, waste-to-energy, nuclear power, and green hydrogen solutions.

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

Power Grid seeks shareholder nod to raise borrowing limit to Rs 2.2 lakh crore

BEML secures additional $5.35 million export order from Middle East

When silence replaces process: PESB's transparency deficit and questions on NCL CMD selection it can’t ignore

Govt fully restores non-domestic packed LPG, eases bulk supply to 50% of pre-crisis level

ONGC brings in bp to lift oil & gas recovery from mature Western Offshore Basin fields