SECL to become first coal PSU to use paste fill technology for mining 
News Updates

SECL to become first coal PSU to use paste fill technology for mining

SECL has signed a Rs 7,040 crore agreement with TMC Mineral Resources Private Limited to adopt paste fill technology for coal mining

PTI

New Delhi: South Eastern Coalfields Limited (SECL) is set to become the first coal PSU in India to adopt paste fill technology for coal mining—marking a major step toward sustainable and environmentally friendly mining practices. To implement this innovative underground mining technology, SECL has signed a Rs 7,040 crore agreement with TMC Mineral Resources Private Limited.

PSU Watch is now on Whatsapp Channels. Click here to join

Under this agreement, large-scale coal production will be undertaken using paste fill technology in the Singhali underground coal mine located in SECL’s Korba area. Over a period of 25 years, the project is expected to produce approximately 8.4 million tonnes (84.5 lakh tonnes) of coal.

What is Paste Fill Technology?

Paste filling is a modern underground mining method that eliminates the need to acquire surface land. After coal extraction, the mined-out voids are filled with a specially prepared paste made from fly ash, crushed overburden from opencast mines, cement, water, and binding chemicals. This process prevents land subsidence and ensures the structural stability of the mine.

Importantly, the paste utilizes industrial waste materials, making the process environmentally sustainable and promoting waste recycling.

Background of Singhali Mine

The Singhali underground mine was approved in 1989 for a production capacity of 0.24 million tonnes per year and commenced operations in 1993. Presently, the mine has 8.45 million tonnes of extractable reserves of G-7 grade non-coking coal. It was developed using the Bord and Pillar method, employing Load Haul Dumpers (LHDs) and Universal Drilling Machines (UDMs) for underground operations.

However, the surface area above the mine is densely occupied—with villages, high-tension electricity lines, and a Public Works Department (PWD) road—rendering traditional caving methods unfeasible due to safety and environmental concerns.

New Opportunity for Singhali Mine

With the introduction of paste fill technology, mining activities in this area can now proceed without disturbing the surface infrastructure.

The successful implementation of this technology in Singhali is expected to pave the way for resuming operations in other underground mines where similar land constraints exist.

A Step Towards Green Mining

With a total investment of Rs 7,040 crore, the project is a major initiative to promote green mining technologies in India. It aims to enhance coal production while significantly reducing environmental impact.

Speaking on the occasion, SECL CMD Harish Duhan said "I firmly believe that paste fill technology will not only secure the future of underground mining but also offer an innovative, eco-friendly solution. This project is a landmark step toward green mining and will shape the future of the coal industry in the years to come."

(PSU Watch– India's Business News centre that places the spotlight on PSUs, Bureaucracy, Defence and Public Policy is now on Google News. Click here to follow. Also, join PSU Watch Channel in your Telegram. You may also follow us on Twitter here and stay updated.)

HSL signs MoU with Pentagon Rugged Systems to develop indigenous anti-drone and long-range communication systems for naval platforms

RVNL secures Southern Railway contract for traction system upgradation in Tamil Nadu

Indian Oil's Niranjan Bhalerao going to be next Director (Finance) of GRSE

Air India pays compensation to 2/3rds of June 12 crash victims

Tata Steel receives Rs 1,902 crore demand notice over 'shortfall' in mineral dispatch from Odisha block